Design, supply and installation works for the:
- Second 330 kV single circuit Pensulo-Mpika overhead transmission line, 184km length, and associated substation works
- Second 330 kV single circuit Mpika-Kasama overhead transmission line, 197km length, and associated substation works at Mpika and Kasama
- Double circuit 330 kV Kasama-Nakonde overhead transmission line, 212km length
- Double circuit 400 kV overhead transmission line from Nakonde to the Tanzanian border, 15km length (charged at 330 kV)
- Double circuit 132 kV Isoka-Nakonde (loop in and out of 66 kV Isoka-Nakonde line) overhead transmission line, 12km length
- New Nakonde 330/132/66 kV substation
- Dynamic voltage support devices (±250MVAr) and associated substation works at Pensulo and the new Nakonde substation