The Mfolozi Water Project Phase 3 involves a 40-month feasibility study for the development of the Lower Mfolozi Dam, aimed at improving long-term water security in northern KwaZulu-Natal, South Africa. This phase will assess the technical, environmental, and economic viability of constructing an off-channel storage dam on the Black Mfolozi River, which is a key tributary within the Zululand regional water system.
The study will include hydrological modeling, geotechnical investigations, environmental impact assessments, socio-economic analysis, and preliminary engineering designs.